REQUEST FOR PUBLIC INPUT – U.S. 285 New Port of Entry, CN 2104600

The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, invites public input on the U.S. 285 Port of Entry and Weigh-in-Motion (POE/WIM) study in Eddy County, New Mexico. The purpose of the study is to determine a suitable location and conceptual design for a new POE/WIM station on U.S. 285 south […]

Virtual Public Meeting – St. Francis and St. Michael’s Interchange, CN S100440

The New Mexico Department of Transportation and Federal Highway Administration invite you to attend the second Public Meeting for the St. Francis-St. Michael’s Interchange Study. The purpose of the study is to address physical, operational, and safety deficiencies and to enhance pedestrian and bicycle connectivity through the interchange area. The purpose of the Virtual Meeting […]

Public Meeting – NM 159 Vehicle Length Restrictions Study & Analysis, CN U900440

Glenwood Community Center 21 Menges Lane, Glenwood, New Mexico, United States

IN-PERSON MEETING LOCATION Thursday, October 5, 2023 starting at 5:30 PM (MTD)Glenwood Community Center21 Menges Lane, Glenwood, NM 88039The New Mexico Department of Transportation is leading the NM 159 Vehicle Length Restrictions Study and Analysis. With the study, an analysis was conducted to see how different types of vehicles navigate a portion of NM 159. Based […]

Request for Public Input on Draft 2023 MS4 Annual Reports

Per the requirements of NPDES MS4 Permits, draft copies of NMDOT MS4 Annual Reports covering Albuquerque, Las Cruces/Anthony, Santa Fe, and Farmington have been made available for public review. Please […]

Public Meeting – U.S. 60 Socorro Alignment Study, CN 1102050

Socorro Convention Center 1220 US 60, Socorro, NM, United States

The New Mexico Department of Transportation (NMDOT) invites you to join us for a public meeting to discuss a study underway for U.S. Highway 60 in Socorro between Mantanza Arroyo (milepost 136.2) and South California Street (milepost 139). The study team has been documenting the existing conditions and developing improvement alternatives for the corridor. The […]

Public Meeting for the I-25 S-Curve Area Study, CN A302370

The New Mexico Department of Transportation (NMDOT), in cooperation with the Federal Highway Administration (FHWA), is conducting a Phase IB Study for the Interstate 25 (I-25) S-Curve Area in Albuquerque […]

Public Meeting – US 60 Mountainair Study, CN 5101350

Dr. Saul Community Center 109 North Roosevelt Avenue, Mountainair, United States

The New Mexico Department of Transportation (NMDOT) invites you to join us for an in-person public meeting for the U.S. Highway 60 through Mountainair Alignment Study.  The purpose of the study is to address roadway surface conditions, drainage within the right-of-way, skewed cross streets, lighting, parking and access management, and bicycle and pedestrian access, including […]

Public Meeting for the Texico-Farwell Railroad Bridge Project

Farwell ISD Administration Building 805 Ave. G, Farwell, Texas

The Texas Department of Transportation (TxDOT), in partnership with the New Mexico Department of Transportation (NMDOT), invites you to join us for a public meeting on either of the two […]

Public Meeting for the I-25 Gibson Interchange Reconstruction Project, CN A301890

East San Jose Elementary School 415 Thaxton Ave. SE, Albuquerque, New Mexico

The New Mexico Department of Transportation (NMDOT) is planning improvements to I-25 at the Gibson Boulevard interchange and between Sunport Boulevard and Avenida Cesar Chavez in Albuquerque as part of the I-25 Gibson Interchange Reconstruction Project. The transportation improvements will enhance safety and improve efficiency for all modes of transportation, including drivers, cyclists, and pedestrians. […]

Virtual Public Meeting – I-40 Corridor Study, CN 6101580

You are invited to attend the third virtual public meeting for the I-40 Corridor Study, hosted by the NMDOT. The I-40 Corridor Study includes developing a long-term improvement plan for 150 miles of I-40 from the Arizona state line to the Atrisco Vista Interchange in Albuquerque. At the meeting, the study team will discuss the […]