Loading Events

« All Events

  • This event has passed.

Request for Public Input on Draft MS4 Annual Reports

October 6, 2023 - November 19, 2023

THE NEW MEXICO DEPARTMENT OF TRANSPORTATION’S DRAFT MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) AREAS ANNUAL REPORTS ARE AVAILABLE FOR PUBLIC REVIEW.

Per the requirements of NPDES MS4 Permits, draft copies of NMDOT MS4 Annual Reports covering Albuquerque, Las Cruces/Anthony, Santa Fe, and Farmington have been made available for public review. Please see the links below. All public input will be considered in preparation of the final Annual Reports and any changes to NMDOT Stormwater Management Plans.

The 45-day comment period closed on November 19, 2023.  Thank you for your participation!

NMDOT DRAFT REPORTS for MS4 AREAS in New Mexico

Middle Rio Grande Watershed -Permit No. NMR04A000
• Albuquerque – D3 Annual Report FY 2023 Draft

Small MS4 Areas – Permit No. NMR040000
• Las Cruces/Anthony – D1 Annual Report FY 2023 DRAFT
• Santa Fe – D5 (Santa Fe) Annual Report FY 2023 DRAFT
• Farmington – D5 (Farmington) Annual Report FY 2023 DRAFT

Details

Start:
October 6, 2023
End:
November 19, 2023
Event Categories:
,
Website:
https://www.dot.nm.gov/infrastructure/environment/roadside-community-design-section/#stormwater