REQUEST FOR PUBLIC INPUT – NM 434 from the Mora/Colfax Cty line to NM 120, CN 4100383

The NMDOT, in cooperation with FHWA, is continuing work on the reconstruction of NM 434 within Mora and Colfax counties.  NM 434 is an important regional transportation facility within the north-central portion of the state, providing a primary connection between Mora and Angel Fire as well as access to a number of smaller communities. In […]

REQUEST FOR PUBLIC INPUT – U.S. 285 New Port of Entry, CN 2104600

The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, invites public input on the U.S. 285 Port of Entry and Weigh-in-Motion (POE/WIM) study in Eddy County, New Mexico. The purpose of the study is to determine a suitable location and conceptual design for a new POE/WIM station on U.S. 285 south […]

Virtual Public Meeting – St. Francis and St. Michael’s Interchange, CN S100440

The New Mexico Department of Transportation and Federal Highway Administration invite you to attend the second Public Meeting for the St. Francis-St. Michael’s Interchange Study. The purpose of the study is to address physical, operational, and safety deficiencies and to enhance pedestrian and bicycle connectivity through the interchange area. The purpose of the Virtual Meeting […]

Public Meeting – NM 159 Vehicle Length Restrictions Study & Analysis, CN U900440

Glenwood Community Center 21 Menges Lane, Glenwood, New Mexico, United States

IN-PERSON MEETING LOCATION Thursday, October 5, 2023 starting at 5:30 PM (MTD)Glenwood Community Center21 Menges Lane, Glenwood, NM 88039The New Mexico Department of Transportation is leading the NM 159 Vehicle Length Restrictions Study and Analysis. With the study, an analysis was conducted to see how different types of vehicles navigate a portion of NM 159. Based […]

Request for Public Input on Draft 2023 MS4 Annual Reports

Per the requirements of NPDES MS4 Permits, draft copies of NMDOT MS4 Annual Reports covering Albuquerque, Las Cruces/Anthony, Santa Fe, and Farmington have been made available for public review. Please see the links below. All public input will be considered in preparation of the final Annual Reports and any changes to NMDOT Stormwater Management Plans.The […]