Second Virtual Public Meeting for the NM 264 Study, CN 6101220

The NMDOT is conducting an alignment study and has evaluated a number of improvement alternatives for the 16-mile NM 264 highway that runs from the Arizona/New Mexico state line to the US 491 interchange near Yah-Ta-Hey. NM 264 serves as a key corridor to the Navajo Nation, connecting communities to their capital in Window Rock, […]

Second Public Meeting for I-25 San Antonio Interchange Study, CN 1102060

The NMDOT is conducting an alignment study and has evaluated a number of improvement alternatives for the I-25 San Antonio Interchange, which is approximately 0.5 miles west of San Antonio, New Mexico between Mileposts 139 and 140. The interchange at I-25 connects with US 380, which is the main road into the nearby community of […]

In-Person Public Meeting – NM 63 Bridge Replacement Project, CN 4101410

Pecos High School Auditorium 28 Panther Parkway, Pecos, NM, United States

The NM Highway 63 Pecos Canyon Bridge Replacement Project is currently in design development.  Construction is anticipated in late 2024. The NMDOT is proposing the replacement of the bridge across the Rio Mora near its junction with the Pecos River in San Miguel County, New Mexico. The bridge was built in 1940, and although it […]

In-Person Public Meeting – Border Highway Connector Study, CN E100390

Dona Ana Community College 3365 McNutt Rd, Sunland Park, NM, United States

The New Mexico Border Authority (NMBA), in conjunction with the New Mexico Department of Transportation (NMDOT), is currently leading the Border Highway Connector Study. The Study is being completed to evaluate a new roadway corridor connecting NM Highway 136 and NM Highway 273, expanding the local and regional transportation network.  The purpose of the meeting […]

REQUEST FOR PUBLIC INPUT – NM 434 from the Mora/Colfax Cty line to NM 120, CN 4100383

The NMDOT, in cooperation with FHWA, is continuing work on the reconstruction of NM 434 within Mora and Colfax counties.  NM 434 is an important regional transportation facility within the north-central portion of the state, providing a primary connection between Mora and Angel Fire as well as access to a number of smaller communities. In […]

REQUEST FOR PUBLIC INPUT – U.S. 285 New Port of Entry, CN 2104600

The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, invites public input on the U.S. 285 Port of Entry and Weigh-in-Motion (POE/WIM) study in Eddy County, New Mexico. The purpose of the study is to determine a suitable location and conceptual design for a new POE/WIM station on U.S. 285 south […]

Virtual Public Meeting – St. Francis and St. Michael’s Interchange, CN S100440

The New Mexico Department of Transportation and Federal Highway Administration invite you to attend the second Public Meeting for the St. Francis-St. Michael’s Interchange Study. The purpose of the study is to address physical, operational, and safety deficiencies and to enhance pedestrian and bicycle connectivity through the interchange area. The purpose of the Virtual Meeting […]

Public Meeting – NM 159 Vehicle Length Restrictions Study & Analysis, CN U900440

Glenwood Community Center 21 Menges Lane, Glenwood, New Mexico, United States

IN-PERSON MEETING LOCATION Thursday, October 5, 2023 starting at 5:30 PM (MTD)Glenwood Community Center21 Menges Lane, Glenwood, NM 88039The New Mexico Department of Transportation is leading the NM 159 Vehicle Length Restrictions Study and Analysis. With the study, an analysis was conducted to see how different types of vehicles navigate a portion of NM 159. Based […]

Request for Public Input on Draft 2023 MS4 Annual Reports

Per the requirements of NPDES MS4 Permits, draft copies of NMDOT MS4 Annual Reports covering Albuquerque, Las Cruces/Anthony, Santa Fe, and Farmington have been made available for public review. Please see the links below. All public input will be considered in preparation of the final Annual Reports and any changes to NMDOT Stormwater Management Plans.The […]