Purpose of the Meeting Construction on this project to improve 1.048 miles of US 70/North Main Street from Milepost 149.10 (Spitz Ave/N. Solano Dr) to Milepost 150 (Elks Dr/N. Triviz Dr) has been underway since January 30, 2024. At this meeting, the construction team will discuss progress to date and upcoming planned traffic impacts. Participants […]
The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is evaluating a future roadway to improve access, mobility, and connectivity by establishing a new east/west corridor in the region of the United States/Mexico border. At […]
The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is evaluating a future roadway to improve access, mobility, and connectivity by establishing a new east/west corridor in the region of the United States/Mexico border. At […]
The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is evaluating a future roadway to improve access, mobility, and connectivity by establishing a new east/west corridor in the region of the United States/Mexico border. At […]
The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, is hosting an In-Person Public Meeting for the US 64/NM 17 Chama Alignment Study within the Village of Chama. On NM 17, the Study limits extend from the US 64 Intersection to 1st Street. On US 64, the limits extend from 0.25 […]
If you recall, the NMDOT hosted several meetings for the NM 68, US 84/285 Alignment Study in Española over the past two years. The study was completed last summer and the corridor was broken up into three phases for design and construction. The team has been developing a proposed design for Phase 1, which begins […]
The New Mexico Department of Transportation (NMDOT), in cooperation with the Federal Highway Administration, invites you to attend the second public meeting for the I-25 S-Curve Area Study. At the public meeting, the team will go over the initial alignment and interstate exchange options considered, those eliminated, and the recommended options to advance. Please join […]
This event is a Public Education Open House. At this event, project team members will provide education to local residents and community members on how to safely navigate the three new roundabouts on Date Street (I-25 Business Loop 11). This late afternoon event is open to the general public and will be paired with a […]
LAS CRUCES – The New Mexico Department of Transportation Traffic Safety Division (NMDOT TSD) and Safer New Mexico Now will host an in-person Car Seat Fitting Station from 3 p.m. to 5 p.m. on Thursday, May 2, 2024, at the Sisbarro Buick-GMC, 425 West Boutz Road in Las Cruces. This free educational event provides parents […]
The Texas Department of Transportation (TxDOT), in partnership with the New Mexico Department of Transportation (NMDOT), invites you to join us for an open house on May 9th. During the open house, we will display a new bridge design for the Farwell-Texico Bridge Project. This new design is being brought to the public as we […]
The New Mexico Department of Transportation (NMDOT) is currently developing the I-40 Drainage Improvement and Bridge Replacement Project, which will construct drainage improvements and bridge replacements on I-40 and NM-118 at Mile Post 29.7 south of Church Rock, east of NM-566. A meeting was hosted to share project details, discuss potential temporary road closures and […]