Public Meeting – NM 136 Interchange Feasibility Study, CN E100430
NMDOT is studying NM 136, a major arterial, connecting the Santa Teresa Port of Entry and access to Interstate 10 in El Paso via the Artcraft Road interchange. An in-person […]
NMDOT is studying NM 136, a major arterial, connecting the Santa Teresa Port of Entry and access to Interstate 10 in El Paso via the Artcraft Road interchange. An in-person […]
AVAILABLE FOR PUBLIC REVIEW FOR 45 DAYS - Per the requirements of the National Pollutant Discharge Elimination System (NPDES) MS4 Permits, draft copies of NMDOT MS4 Annual Reports covering Albuquerque, […]
NMDOT hosted an in-person public meeting for the Interstate 40 (I-40) Miyamura Interchange Study. The purpose of the meeting was to introduce the study, share data collected, and learn about the community's concerns and ideas. The NMDOT is conducting a study, in cooperation with the Federal Highway Administration, on I-40 between mileposts 21.7 (near 2nd […]
The New Mexico Department of Transportation (NMDOT) hosted a public meeting to discuss the study underway for U.S. Highway 60 in Socorro between Mantanza Arroyo (milepost 136.2) and South California Street (milepost 139). Following the 2023 public meeting, the team considered all the input received, refined the alternatives, and conducted a detailed evaluation to identify […]
The Texas Department of Transportation (TxDOT), in partnership with the New Mexico Department of Transportation (NMDOT), invites you to join us for a public meeting to gather input about revision to previously presented bridge design.For assistance with language translation or Americans with Disabilities Act accommodations, contact Ayssa Trevino, TxDOT District Environmental Coordinator, at 806-748-4417 or […]
Following a multi-year study, the New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, is planning to perform drainage improvements along I-40 and NM 118 about 14 miles east of Gallup in McKinley County, New Mexico. The project aims to reduce flooding and overtopping of the roadways. Work will involve the replacement […]
JOIN US! The NMDOT, in cooperation with FHWA, has developed design plans to improve the north phase (Phase 3) of the NM 68 Roadway Improvements Project. Phase 3 begins near the Calle Valdez intersection and extends 1.8 miles north just past the Po'Pay Avenue intersection. The purpose of the meeting is to present the roadway […]
The NMDOT is hosting the third public meeting for the I-25 S-Curve Area Study. The I-25 S-Curve Area Study is evaluating transportation solutions to improve safety and mobility while reducing impacts on the community. At the public meeting, the team will share what we heard during the previous comment period, the no-build and build design […]
The New Mexico Border Authority, in cooperation with NMDOT and FHWA, would like to invite you to participate in an Open House Event for a future road (Border Highway Connector) between NM 136 and NM 273, to improve access, mobility, and connectivity by establishing a new east/west corridor in the region of the US/Mexico border. […]
The New Mexico Border Authority, in cooperation with NMDOT and FHWA, would like to invite you to participate in a Public Meeting for a future road (Border Highway Connector) between […]
Public Meeting for NM 128 Phases 1 and 2, CN 2104330 Join us virtually for a public meeting on the planned roadway improvements and proposed construction for Phases 1 and […]