• Third Public Meeting – I-25 San Antonio Interchange Project, CN 1102060

    The New Mexico Department of Transportation (NMDOT) is developing the design of the proposed improvements to the Interstate 25 (I-25) San Antonio Interchange, which is approximately 0.5 miles west of San Antonio, New Mexico, between milepost (MP) 139 and MP 140. I-25 connects with US 380, which is the main road into the nearby community […]

  • Public Information Meeting Grant County Bridges Project (NM FLAP SR35(1)) Grant County near Mimbres, NM

    Mimbres Roundup Lodge 91 Acklin Hill Road,, Mimbres, NM, United States

    The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in cooperation with the New Mexico Department of Transportation and the United States Forest Service Gila National Forest, is proposing to implement proposed improvements to three bridges and one box culvert along New Mexico Route 35 (NM 35). The purpose of the project is to […]

  • Public Meeting for the Texico-Farwell Railroad Bridge Project

    Farwell ISD Administration Building 805 Ave. G, Farwell, Texas

    The Texas Department of Transportation (TxDOT), in partnership with the New Mexico Department of Transportation (NMDOT), invites you to join us for a public meeting on either of the two days mentioned below. During the public meetings, both agencies will display changes made to a previously presented bridge schematic. The bridge option being presented proposes […]

  • Public Meeting for I-40 Manuelito Interchange Study, CN 6101600

    Manuelito Chapter House 26 Hunters Point Rd, New Mexico

    The New Mexico Department of Transportation (NMDOT), in cooperation with the Federal Highway Administration (FHWA), is conducting a study of the Interstate 40 and New Mexico Highway 118 interchange located […]

  • In-Person Open House for NM 264 Roadway Improvement Projects, CN 6101220

    Navajo Nation Division of Transportation 16 Old Coal Mine Road, Tse Bonito, New Mexico

    A study evaluating the needs for the NM 264 corridor between Tse Bonito (milepost 0.0) and Yah Tah Hey (milepost 16.0) was completed in 2023. Road reconstruction is starting for the segment between Winchester Road (milepost 9.3) and N. Chapel Hill Road (milepost 14.7). Our team is currently developing design plans for the rest of […]

  • You Are Invited to a Public Meeting on Improvements to US 70 and North Main Street

    Jornada Elementary School (In the Cafeteria) 3400 Elks Drive, Las Cruces, NM, United States

    Purpose of the Meeting Construction on this project to improve 1.048 miles of US 70/North Main Street from Milepost 149.10 (Spitz Ave/N. Solano Dr) to Milepost 150 (Elks Dr/N. Triviz Dr) has been underway since January 30, 2024. At this meeting, the construction team will discuss progress to date and upcoming planned traffic impacts. Participants […]

  • In-Person POP-UP for the Border Highway Connector Study, CN E100390

    Sunland Park Motor Vehicle Division 880 McNutt Road, Sunland Park, New Mexico

    The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is evaluating a future roadway to improve access, mobility, and connectivity by establishing a new east/west corridor in the region of the United States/Mexico border.  At […]