Public Meeting – US 60 Mountainair Study, CN 5101350
The New Mexico Department of Transportation (NMDOT) invites you to join us for an in-person public meeting for the U.S. Highway 60 through Mountainair Alignment Study. The purpose of the […]
The New Mexico Department of Transportation (NMDOT) invites you to join us for an in-person public meeting for the U.S. Highway 60 through Mountainair Alignment Study. The purpose of the […]
The New Mexico Department of Transportation (NMDOT) is developing the design of the proposed improvements to the Interstate 25 (I-25) San Antonio Interchange, which is approximately 0.5 miles west of […]
The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in cooperation with the New Mexico Department of Transportation and the United States Forest Service Gila National Forest, is proposing […]
The Texas Department of Transportation (TxDOT), in partnership with the New Mexico Department of Transportation (NMDOT), invites you to join us for a public meeting on either of the two […]
The New Mexico Department of Transportation (NMDOT) is planning improvements to I-25 at the Gibson Boulevard interchange and between Sunport Boulevard and Avenida Cesar Chavez in Albuquerque as part of […]
You are invited to attend the third virtual public meeting for the I-40 Corridor Study, hosted by the NMDOT. The I-40 Corridor Study includes developing a long-term improvement plan for 150 miles of I-40 from the Arizona state line to the Atrisco Vista Interchange in Albuquerque. At the meeting, the study team will discuss the […]
The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, is hosting an In-Person Public Meeting for the I-25 Safety & Capacity Study, on I-25 from the Lohman Interchange to the Doña Ana Interchange and NM 320 (Thorpe Road) from Barela Drive to I-25. The purpose of the study is to improve […]
The New Mexico Department of Transportation (NMDOT), in cooperation with the Federal Highway Administration (FHWA), is conducting a study of the Interstate 40 and New Mexico Highway 118 interchange located east of the Arizona state line near Manuelito in McKinley County, New Mexico (NM). An in-person public meeting was hosted and the team went over […]
A study evaluating the needs for the NM 264 corridor between Tse Bonito (milepost 0.0) and Yah Tah Hey (milepost 16.0) was completed in 2023. Road reconstruction is starting for […]
Purpose of the Meeting Construction on this project to improve 1.048 miles of US 70/North Main Street from Milepost 149.10 (Spitz Ave/N. Solano Dr) to Milepost 150 (Elks Dr/N. Triviz […]
The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is […]
The New Mexico Border Authority, in cooperation with the New Mexico Department of Transportation and the Federal Highway Administration, is currently leading the Border Highway Connector Study. The study is […]