Virtual Presentation – US 60 Bridges Replacement Project, CN 5101880

Virtual Presentation – US 60 Bridges Replacement Project, CN 5101880

US 60 Bridges Replacement Project (Near the Abo)

The New Mexico Department of Transportation, in cooperation with the Federal Highway Administration, is planning to replace two aging bridges on U.S. Highway 60 (US 60) near the Abo Ruins in Torrance County, New Mexico — and we want to hear from you!

The project will replace:

  • Bridge No. 5734 over Espinosa Canyon
  • Bridge No. 5735 over Barranco Arroyo

Project Limits: From Milepost 193.88 to Milepost 197.68 on US 60
Right-of-Way: All work will occur within the existing highway right-of-way – no additional land is needed.

This project is funded through a combination of federal and state funds.

WHY THIS PROJECT MATTERS

Both bridges were built in 1957 and have experienced deterioration due to age and use. Replacing them now will enhance safety, reliability, and reduce long-term maintenance needs.

Existing bridge conditions include:

  • Two 12-foot travel lanes
  • Two 2-foot shoulders
  • Metal railing on each side
  • Precast concrete girders

PROPOSED IMPROVEMENTS

The new bridges will include:

  • Over a mile of new asphalt pavement and striping replacement, including two 12-foot travel lanes and two 8-foot shoulders
  • A modern single-span prestressed concrete girder design
  • 42-inch concrete barrier railing on each side

CONSTRUCTION APPROACH

  • Schedule: Advertise/award in Spring 2026; construction begins Summer 2026.

  • Phasing: New bridges will be built on an offset alignment to keep traffic moving.

  • US 60 realignment: The highway will be realigned to tie into the new structures.

  • Traffic impacts: At least one lane open throughout construction; temporary lane closures managed with mobile traffic control.

  • Access maintained: Local residents and businesses, emergency services, school buses, and mail service will retain access.

PUBLIC EVENT RESOURCES:



Please take 5 minutes to listen to the video below and learn about the upcoming bridges project.

ï“„

For assistance, language translation, or ADA accommodations, please contact: Haley Steffens at (505) 878-6521. Para solicitar asistencia, servicios de interpretación en su idioma o adaptaciones razonables conforme de la ADA, comuníquese con: Christian Lopez at (915) 304-5232 o christian.lopez@wsp.com.’

PUBLIC COMMENT PERIOD (closed)

The public comment period for this phase of the project closed on December 07, 2025. All comments received during the meeting and through the mail, email, and online form are being reviewed by the project team.

Although the comment period has ended, community members are encouraged to stay informed as the project progresses.

STAY INFORMED

To receive project updates, please sign up for the project mailing list below.

For questions, please contact:

Haley.Steffens@wsp.com

US 60 Bridge Replacement Project Updates

CN 5101880

This field is for validation purposes and should be left unchanged.
November 6, 2025 - December 7, 2025 All Day Event

Add To Calendar