BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20260308T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20261101T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251106
DTEND;VALUE=DATE:20251208
DTSTAMP:20260520T160658
CREATED:20251022T171920Z
LAST-MODIFIED:20251222T225758Z
UID:33452-1762387200-1765151999@www.dot.nm.gov
SUMMARY:Virtual Presentation - US 60 Bridges Replacement Project\, CN 5101880
DESCRIPTION:US 60 Bridges Replacement Project (Near the Abo)\n						The New Mexico Department of Transportation\, in cooperation with the Federal Highway Administration\, is planning to replace two aging bridges on U.S. Highway 60 (US 60) near the Abo Ruins in Torrance County\, New Mexico — and we want to hear from you! \nThe project will replace: \n\nBridge No. 5734 over Espinosa Canyon\nBridge No. 5735 over Barranco Arroyo\n\nProject Limits: From Milepost 193.88 to Milepost 197.68 on US 60Right-of-Way: All work will occur within the existing highway right-of-way – no additional land is needed. \nThis project is funded through a combination of federal and state funds. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						WHY THIS PROJECT MATTERS\n						Both bridges were built in 1957 and have experienced deterioration due to age and use. Replacing them now will enhance safety\, reliability\, and reduce long-term maintenance needs. \nExisting bridge conditions include: \n\nTwo 12-foot travel lanes\nTwo 2-foot shoulders\nMetal railing on each side\nPrecast concrete girders\n\n					\n				\n			\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						PROPOSED IMPROVEMENTS\n						The new bridges will include: \n\nOver a mile of new asphalt pavement and striping replacement\, including two 12-foot travel lanes and two 8-foot shoulders\nA modern single-span prestressed concrete girder design\n42-inch concrete barrier railing on each side\n\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						CONSTRUCTION APPROACH\n						\n\nSchedule: Advertise/award in Spring 2026; construction begins Summer 2026. \n\n\nPhasing: New bridges will be built on an offset alignment to keep traffic moving. \n\n\nUS 60 realignment: The highway will be realigned to tie into the new structures. \n\n\nTraffic impacts: At least one lane open throughout construction; temporary lane closures managed with mobile traffic control. \n\n\nAccess maintained: Local residents and businesses\, emergency services\, school buses\, and mail service will retain access. \n\n\n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						PUBLIC EVENT RESOURCES:\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Please take 5 minutes to listen to the video below and learn about the upcoming bridges project. \n					\n				\n			\n				\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Public Presentation (PDF)\n						November 2025 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						For assistance\, language translation\, or ADA accommodations\, please contact: Haley Steffens at (505) 878-6521. Para solicitar asistencia\, servicios de interpretación en su idioma o adaptaciones razonables conforme de la ADA\, comuníquese con: Christian Lopez at (915) 304-5232 o christian.lopez@wsp.com.’ \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						PUBLIC COMMENT PERIOD (closed)\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						The public comment period for this phase of the project closed on December 07\, 2025. All comments received during the meeting and through the mail\, email\, and online form are being reviewed by the project team. \nAlthough the comment period has ended\, community members are encouraged to stay informed as the project progresses. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						STAY INFORMED\n						To receive project updates\, please sign up for the project mailing list below. \nFor questions\, please contact: \nHaley.Steffens@wsp.com \n					\n				\n			\n				\n				\n				\n				\n				\n\n                \n                        \n                            US 60 Bridge Replacement Project Updates\n                            CN 5101880 \n                        \n                        PhoneThis field is for validation purposes and should be left unchanged.First Name(Required)Last Name(Required)Email Address(Required)Mailing AddressCAPTCHA
URL:https://www.dot.nm.gov/event/us-60-bridges/
END:VEVENT
END:VCALENDAR