In-Person Open House for NM 264 Roadway Improvement Projects, CN 6101220
Please join the in-person open house to learn more!
A study evaluating the needs for the NM 264 corridor between Tse Bonito (milepost 0.0) and Yah Tah Hey (milepost 16.0) was completed in 2023. Road reconstruction is starting for the segment between Winchester Road (milepost 9.3) and N. Chapel Hill Road (milepost 14.7). Our team is currently developing design plans for the rest of the corridor so that improvements can be constructed in segments as funding becomes available. The purpose of the meeting is to go over the preliminary designs developed by the team for the corridor, discuss the prioritization plan, and receive your input.
Click image to enlarge.
PUBLIC EVENT DETAILS
WHEN: Tuesday, March 19, 2024 between 3:00 and 7:00 P.M. (MDT)
WHERE: Navajo Nation Division of Transportation
16 Old Coal Mine, Tse Bonito, NM 87301
To request assistance, language translation, or ADA accommodations, please contact Victoria Romejko at 505-357-7327 or NM264Study@hdrinc.com by March 12, 2024.
If you are unable to attend, the recorded presentation from the in-person public meeting will be posted here soon.
TO LEARN MORE
Visit the Webpage: https://www.dot.nm.gov/projects/nm264study
SHARE YOUR COMMENTS AND QUESTIONS WITH US!
We want to hear from you! Comments are being accepted from May 19 through April 18, 2024. Submit your comments by using the following methods:
Mail: NM 264 Project
C/O Victoria Romejko, HDR Engineering
2155 Louisiana Blvd NE # 3000
Albuquerque, NM 87110
Call: 505-357-7327
Email: NM264Study@hdrinc.com
Comment Form - NM 264 Roadway Improvement Projects, CN 6101220
CN 6101220