Virtual Public Meeting – NM 500 Rio Bravo Bridge Replacement

Virtual Public Meeting – NM 500 Rio Bravo Bridge Replacement

Wednesday, April 13th, 2022

Starting at 6:00 PM (MST)

Event Details

The NMDOT, in cooperation with the FHWA, is planning to replace the east- and west-bound bridges on Rio Bravo (NM 500) across the Rio Grande. The structures are nearing the end of their design-life and are in need of replacement. Existing conditions demonstrate there is also a need to increase the number of travel lanes along Rio Bravo between Isleta Boulevard and 2nd Street. This is also an opportunity to provide enhanced safety for pedestrians and bicyclists. After reviewing public feedback from the first public meeting and conducting a detailed technical analysis, a preferred alternative to replace the bridges has been identified to advance to final design.

REGISTER & JOIN THE MEETING



To Join Online:  
https://linktr.ee/nm500riobravo



To Join by Phone:  +1(346) 248-7799, Webinar ID:  865 8823 0616

SHARE YOUR COMMENT & STAY INFORMED



Comment Period:
April 13th to May 13th, 2022

April 13, 2022 @ 6:00 pm - 7:30 pm

Add To Calendar