Public Meeting for the I-25/US 84 Romeroville Interchange Bridge Project, CN 4101530
THANK YOU FOR JOINING THE IN-PERSON PUBLIC MEETING!
The NMDOT, in cooperation with the Federal Highway Administration, hosted an In-Person Public Meeting for the I-25-US 84 Interchange Bridge Replacement project in Romeroville, San Miguel County, New Mexico. The purpose of the meeting was to go over the proposed design project and to receive your input. A presentation was given followed by a question-and-answer session.
The proposed improvements include roadway reconstruction and rehabilitation, bridge replacement, reconfiguration of the interchange to include a roundabout, signing and striping, replacement of roadside barriers, drainage improvements, and relocation of existing utilities and lighting, as needed. Crossover locations to divert I-25 traffic during construction are anticipated at approximately mileposts 341.7 and 338.5 north and south of the interchange on I-25.
MEETING DETAILS AND RESOURCES
If you were unable to join the meeting, review the presentation provided below and take a minute to share questions and comments with our team.
SHARE YOUR COMMENTS AND QUESTIONS WITH US!
A public comment period will be open from June 12 to July 12, 2024. You can provide comments at the meeting, by email, phone, mail, or the online comment form below.
Mail: Attn: Romeroville Project
C/O Barr Engineering Co.
320 Osuna Road NE, Suite C-1
Albuquerque, NM 87107
Call: 505-980-0993
Email: jtaschek@barr.com
Comment Form - I-25/US 84 Romeroville Interchange Project, CN 4101530
CN 4101530