Phase I - A/B NM 556 (Tramway Blvd NE) Corridor Study

Milepost 7.75 to 15.4, Albuquerque, Bernalillo County

NMDOT Control No. A300342

STUDY OVERVIEW

WHERE IS THE TRAMWAY STUDY AREA?

Due to the high volume of daily commuters and active transportation users along NM 556 (Tramway Boulevard NE), the New Mexico Department of Transportation (NMDOT) has identified the need to conduct a traffic operations and safety study. The study area spans from milepost 7.75 to milepost 15.4, covering the segment between the intersections of Live Oak Road and Central Avenue in the City of Albuquerque, NM.

Tramway Boulevard NE is the easternmost north-south regional principal arterial serving Albuquerque, situated between the city and the base of the Sandia Mountains. It is a four-lane, limited-access, divided highway with a posted speed limit of 55 mph (see Figure 1). The corridor also provides connections to several key east-west principal and minor arterials, including Paseo del Norte, Montgomery Boulevard, Candelaria Road, Indian School Road, Lomas Boulevard, Menaul Boulevard, and Academy Road.

WHAT IS THE GOAL FOR THE TRAMWAY STUDY?

The purpose of this NMDOT study is to evaluate traffic signals, intersection flow, speed conditions, and existing intersection geometry along Tramway Blvd NE. The primary goal is to identify solutions that enhance safety and improve traffic operations. The findings will inform recommendations and help prioritize safety and operational improvements within the study area.

WHERE ARE WE AND WHAT ARE THE NEXT STEPS?

The study team has gathered data on existing conditions within the corridor and developed preliminary improvement alternatives. This summer, the team plans to present the findings to the community to gather feedback and help refine the proposed options. Once public input is incorporated and the alternatives are further analyzed, a prioritization plan will be created. This plan will guide phased implementation as funding becomes available.

A300342-Study Area Map

Figure 1. Study Area Vicinity Map (click to enlarge).

STUDY RESOURCES

BACKGROUND HISTORY OF TRAMWAY BLVD AND NM 556

Tramway Boulevard was initially developed in the early 1970s as a two-lane roadway through joint efforts by the City of Albuquerque and Bernalillo County. At that time, the corridor was not part of the state highway system. In response to a corridor plan adopted in the late 1970s, the roadway underwent significant upgrades in the early 1980s. It was expanded into a four-lane, limited-access, divided highway to accommodate growing traffic demands.

By the 1990s, the improved section of Tramway Boulevard was formally incorporated into the New Mexico state highway system and designated as State Road 556 (NM 556).

Now, with much of the corridor’s infrastructure nearing 30 years in age, there is a clear need to evaluate its condition and strategically plan for future maintenance and upgrades to ensure continued safety, efficiency, and alignment with regional transportation goals.

PUBLIC INVOLVEMENT

WHAT ROLE CAN YOU PLAY IN THIS PROCESS?

Public engagement is a vital part of the NMDOT Location Study Procedures. While funding for future improvements has not yet been secured, this study will help identify key issues along the corridor and support efforts to prioritize and pursue funding.

The initial phase of public outreach will focus on introducing the study to corridor users, gathering input on current conditions, and deepening the understanding of challenges faced by all modes of transportation. After alternatives have been evaluated, additional outreach will be conducted to share findings, present the preferred alternative and phasing priorities, and outline the next steps in the process.

The Public Involvement Plan (PIP) will serve as a living document, continuously reviewed and updated as the project advances.

UPCOMING PUBLIC EVENT - August 2025

NMDOT will host a public meeting in August 2025.  Please check back for more details on the public meeting location, date, and time.

A300342-Image 3 along Tramway corridor

Figure 2. View looking north from the intersection of Tramway Boulevard NE and Montgomery Boulevard NE.

Join the Mailing List for the NM 556 (Tramway Blvd NE) Corridor Study

Live Oak Road and Central Avenue, CN A300342

This field is for validation purposes and should be left unchanged.

NM 556 (Tramway) Corridor Study

Project Timeline

\

Fall/Winter 2024

  • Collect existing condition data
  • Establish the need for improvements
\

Spring/Summer 2025

• Identify preliminary highway improvement alternatives
• Public Event #1 – August 2025

\

Fall/Winter 2025

• Evaluate improvement alternatives in detail
• Prepare draft Corridor Study document

\

Winter/Spring 2026

• Public Event #2 – February 2026
• Identify recommended alternative(s) and develop prioritization plan

\

Summer 2026

• Finalize NM 556 Corridor Study

County

Bernalillo

District

District 3

Funding Control Number

Status

Study and Design

Contact

Joseph Casares, PE
Project Development Engineer
505-469-4239