BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Denver:20230223T180000
DTEND;TZID=America/Denver:20230223T193000
DTSTAMP:20260307T210212
CREATED:20230215T201416Z
LAST-MODIFIED:20230215T201836Z
UID:18924-1677175200-1677180600@www.dot.nm.gov
SUMMARY:Virtual Public Meeting - I-25 Safety and Capacity Study\, NM 320 (Thorpe Road) Section from Mileposts 1.25 to 2.0
DESCRIPTION:Event Details\nThursday\, February 23\, 2023Starting at 6:00 PM (MT)\nThe New Mexico Department of Transportation\, in cooperation with the Federal Highway Administration\, is hosting two Public Meetings to discuss the I-25 Safety & Capacity Study\, on I-25 in the City of Las Cruces from the Lohman Interchange (Milepost [MP] 2.8) to the Doña Ana Interchange (MP 10.5) and on NM 320 (Thorpe Road) from the Doña Ana Interchange to Barela Drive.  The purpose of this study is to address safety and capacity needs\, including deficiencies with pavement\, geometry\, access control\, drainage management\, and Americans with Disability Act facilities. The goal of this Public Meeting is to focus on segment of NM 320 (Thorpe Road) between I-25 and Barela Drive\, to present the existing conditions\, study alternatives\, and initial recommendations\, and receive input from the community and users of the road.  A presentation will be given followed by a question-and-answer session.  For more information on the rest of the I-25 Study Area between the Lohman and Dona Ana Interchanges\, please visit the project website. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						TO LEARN MORE\, SHARE COMMENTS\, OR REQUEST ASSISTANCE\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						VISIT THE STUDY WEBPAGE to review resources available\, stay informed\, and learn more about how to submit comments and questions before the close of the comment period on March 23\, 2023https://i25nm.com/  \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						TO REQUEST TECHNICAL ASSISTANCE\, HARD COPIES\, OR OTHER SUPPORT\, please contact John Tasheck at 505-980-0993. \nSe proporcionará interpretación al español en la reunión. Para obtener información en español\, envíe un correo electrónico a John Taschek a jtaschek@ecosphere-services.com. \n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						TO JOIN THE MEETING\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						To attend in-person\, join us at:Doña Ana Elementary School5551 Cam De FloresLas Cruces\, NM 88007 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						To join online register at:  https://bit.ly/i25feb23Register for the Virtual Meeting in advance using the link above. A confirmation email will then be provided explaining how to join either using Zoom or by telephone. Spanish language interpretation will be provided at the meeting.
URL:https://www.dot.nm.gov/event/virtual-public-meeting-i-25-safety-and-capacity-study-nm-320-thorpe-road-section-from-mileposts-1-25-to-2-0/
CATEGORIES:NMDOT Projects,Public Meetings
END:VEVENT
END:VCALENDAR