BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.15.18//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20230901
DTEND;VALUE=DATE:20231001
DTSTAMP:20260405T093514
CREATED:20230811T202514Z
LAST-MODIFIED:20230828T153539Z
UID:21141-1693526400-1696118399@www.dot.nm.gov
SUMMARY:REQUEST FOR PUBLIC INPUT - NM 434 from the Mora/Colfax Cty line to NM 120\, CN 4100383
DESCRIPTION:The NMDOT\, in cooperation with FHWA\, is continuing work on the reconstruction of NM 434 within Mora and Colfax counties.  NM 434 is an important regional transportation facility within the north-central portion of the state\, providing a primary connection between Mora and Angel Fire as well as access to a number of smaller communities. In 2012 the NMDOT began the process to plan and design a series of construction projects to reconstruct 8 1/2 miles of the existing roadway beginning just to the north of Coyote Creek State Park and ending at the Junction of NM 434 and NM 120. Construction has been completed along the southernmost 3.9 miles of the project area\, and will continue soon on an additional 2.2 miles that will end at the Mora/Colfax County Line. \nThe remaining 2 ½ miles of improvements will complete the project from the County Line to the intersection of NM 434 & NM 120. Planned improvements for the northernmost 2 ½ miles of the project area are currently in the final design stage. Construction is anticipated to begin in the summer of 2026\, with the possibility of an earlier start date depending on the availability of funds. Safety and operational enhancements will include widening the roadway to accommodate two 12-foot driving lanes with 6-foot outside shoulders\, and associated alignment and roadside improvements. The majority of the new roadway will follow the existing roadway alignment. A short 0.38-mile stretch will be offset about 400 feet to the east along a new alignment and will include a new bridge crossing over Coyote Creek at the Black Lake outfall. A small portion of the existing roadway\, including the culverts at the creek crossing\, will be converted into an NMDOT maintenance road. The remainder of the existing road within the realignment area will be removed and abandoned. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						INFORMATION FLYER (English) August 2023 \n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						SHARE YOUR COMMENTS & QUESTIONS WITH THE TEAM BY SEPTEMBER 30th\, 2023.\n						\n					\n				\n			\n				\n				\n				\n				\n				For questions\, additional information\, to share comments\, or  request an in-person meeting\, please contact: \n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Email: Dana.Garcia@dot.nm.gov  \n \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Mail: NM 434 Road Improvementsc/o Dana GarciaN.M. Department of TransportationP.O. Box 1149 (Room 203)Santa Fe\, NM 87504-1149 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Call: 505-231-7663 If no answer\, please leave your name & best phone number\, so we can call you right back! \n					\n				\n			\n			\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n\n                \n                        \n                            Comment Form - NM 434 Mora/Colfax County line to NM 120\n                            CN 4100383 \n                        \n                        LinkedInThis field is for validation purposes and should be left unchanged.First Name(Required)Last Name (optional)Email Address (optional)Comments and/or Questions(Required)How did you learn about this public event? (check all that apply)\n								\n								social media\n							\n								\n								email\n							\n								\n								flyer\n							\n								\n								other\n							Select AllWas the information shared easy to understand?Let us know how we can better reach you and your neighbors.CAPTCHA
URL:https://www.dot.nm.gov/event/nm-434-phase-4/
CATEGORIES:NMDOT Projects,Public Meetings
END:VEVENT
END:VCALENDAR