BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20260308T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20261101T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20251205
DTEND;VALUE=DATE:20251222
DTSTAMP:20260514T062242
CREATED:20251205T192455Z
LAST-MODIFIED:20260115T000855Z
UID:33731-1764892800-1766361599@www.dot.nm.gov
SUMMARY:I-25 Nogal Canyon Bridge Replacement Project
DESCRIPTION:PROJECT OVERVIEW\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						The New Mexico Department of Transportation (NMDOT)\, in coordination with the Federal Highway Administration (FHWA)\, is replacing the Interstate 25 (I-25) truss bridges over Nogal Canyon at Milepost 107 in Socorro County with two new structures. The new structures and surrounding roadway will be updated to meet current safety and performance standards. The new three-span steel structure and roadway improvements will enhance safety\, stability\, and long-term reliability along this section of I-25. \n					\n				\n			\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						PURPOSE\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						\nIMPROVE safety for drivers and freight traffic.\nPROTECT the environment by reducing erosion and enhancing slope stability.\nENSURE long-term reliability of New Mexico’s interstate network.\nMAINTAIN regional connectivity for residents\, tourists and commercial freight.\n\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						PROJECT AREA\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Built in 1968\, the Nogal Canyon bridges are located on I-25 in between Socorro and Truth or Consequences\, New Mexico. \nThe bridges are three-span Warren Truss structures with a 265-foot main span and a total width of 34 feet (two 12-foot lanes with narrow shoulders). They sit within an I-25 right-of-way that ranges from about 200 to 550 feet wide\, surrounded by lands owned by the Bureau of Land Management\, the State of New Mexico\, and private property owners. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						PROPOSED IMPROVEMENTS\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						\nRealignment and widening of I-25 through Nogal Canyon\nDrainage improvements to the existing slopes and canyon\nSlope stability improvements including erosion improvements\nNew signing and striping to enhance visibility and safety\n\n					\n				\n			\n				\n				\n				\n				\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						PUBLIC RESOURCES\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Please take 10 minutes to listen to the video below and learn about the upcoming bridge project. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						ENGLISH PRESENTATION \n					\n				\n			\n				\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						SPANISH PRESENTATION \n					\n				\n			\n				\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Public Presentation (PDF)\n						December 2025 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Spanish Public Presentation (PDF)\n						December 2025 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Project Fact Sheet\n						December 2025 \n					\n				\n			\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						For assistance\, language translation\, or ADA accommodations\, please contact: Haley Steffens at (505) 878-6521. Para solicitar asistencia\, servicios de interpretación en su idioma o adaptaciones razonables conforme de la ADA\, comuníquese con: Christian Lopez at (915) 304-5232 o christian.lopez@wsp.com.’ \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						SIGN UP FOR PROJECT UPDATES\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Public Comment Period\n						The public comment period for this phase of the project closed on December 21\, 2025. All comments received during the meeting and through the mail\, email\, and online form are being reviewed by the project team. \nAlthough the comment period has ended\, community members are encouraged to stay informed as the project progresses. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Stay Informed\n						To receive project updates\, please sign up for the project mailing list below.  \nFor questions\, please contact:  \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						haley.steffens@wsp.com \n					\n				\n			\n				\n				\n				\n				\n				\n\n                \n                        \n                            I-25 Nogal Canyon Bridge Replacement Project Updates\n                            CN 1100980 \n                        \n                        CompanyThis field is for validation purposes and should be left unchanged.First Name(Required)Last Name(Required)Email Address(Required)Mailing AddressCAPTCHA
URL:https://www.dot.nm.gov/event/i-25-nogal-canyon-bridges/
CATEGORIES:NMDOT Projects
END:VEVENT
END:VCALENDAR