BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Denver:20240215T173000
DTEND;TZID=America/Denver:20240215T193000
DTSTAMP:20260420T165232
CREATED:20240202T162034Z
LAST-MODIFIED:20240202T163212Z
UID:23229-1708018200-1708025400@www.dot.nm.gov
SUMMARY:Public Meeting for the Texico-Farwell Railroad Bridge Project
DESCRIPTION:The Texas Department of Transportation (TxDOT)\, in partnership with the New Mexico Department of Transportation (NMDOT)\, invites you to join us for a public meeting on either of the two days mentioned below. During the public meetings\, both agencies will display changes made to a previously presented bridge schematic. \nThe bridge option being presented proposes the elimination of the existing at-grade (surface) crossing at the Texas and New Mexico state line. The construction of this bridge would span the existing railroad line and allow the traveling public to experience continuous traffic flow without train delays. Alternative number two\, which was previously presented to the communities as U.S. 60 and F.M. 292 Train Bypass Route\, has been eliminated as a feasible design.  The public is encouraged to participate and provide feedback about the proposed revisions. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Purpose and Need of the Project:\n						1.  Enhance the traffic mobility for emergency responders in the communities.2.  Provide a safer crossing for roadway users by eliminating the at-grade railroad crossing at the Texas and New Mexico state line.3.  Reduction of delayed traffic and congestion at streets attempting to enter US 60\, US 70/84 in the communities of Texico\, NM\, and Farwell\, TX.4.  Reduce the potential for train versus pedestrian and train versus vehicle crashes.Eliminate train delays which will improve access on US 60/70/84. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						VISIT THE TXDOT MEETING WEBPAGE: https://www.txdot.gov/projects/hearings-meetings/lubbock/farwell-railroad-bridge-021524.html \n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						MEETING DETAILS AND RESOURCES\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						IN-PERSON MEETING LOCATION Thursday\, Feb. 15\, 20245:30 – 7:30 p.m. (CST)Farwell ISD Administration Building805 Ave. GFarwell\, TX 79325 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						The in-person public meetings will be conducted in English. Headsets will be available at both meetings for those needing simultaneous Spanish translation services. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						IF YOU ARE UNABLE TO ATTEND:An English and Spanish pre-recorded presentation including audio and visual components will be available on the TXDOT meeting webpage by 4 p.m. (CST) on Thursday\, Feb. 15\, 2024. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						TO LEARN MORE AND SHARE COMMENTS\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Comments must be received or postmarked by Friday\, March 8\, 2024\, to be a part of the public meeting record.  Details on how to share comments is on the TXDOT meeting webpage.
URL:https://www.dot.nm.gov/event/farwell-public-meeting-rr-bridge-project/
LOCATION:Farwell ISD Administration Building\, 805 Ave. G\, Farwell\, Texas\, 79325
CATEGORIES:NMDOT Projects,Public Meetings
END:VEVENT
END:VCALENDAR