BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20260308T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20261101T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Denver:20251002T180000
DTEND;TZID=America/Denver:20251002T193000
DTSTAMP:20260416T081639
CREATED:20250910T152608Z
LAST-MODIFIED:20251110T231736Z
UID:33087-1759428000-1759433400@www.dot.nm.gov
SUMMARY:NM 554 El Rito Bridge Replacement\, CN 5101287
DESCRIPTION:NM 554 El Rito Bridge Replacement Project\n						The NMDOT hosted an in-person public meeting on October 2\, 2025\, to discuss the NM 554 El Rito Bridge Replacement Project in El Rito\, Rio Arriba County\, NM. The meeting took place at the El Rito Public Library and included a brief presentation followed by a Q&A session.  \nThe project will replace the aging bridge on NM Highway 554 that crosses El Rito Creek at the northern edge of El Rito.  The existing bridge is in poor condition and will be replaced to enhance safety\, maintain long-term access\, and meet current engineering standards. \nDuring the meeting\, attendees viewed the proposed bridge design\, learned about anticipated traffic and access impacts during construction\, as well as environmental considerations. Community feedback provided during the meeting will inform the ongoing design process. \n					\n				\n			\n				\n				\n				\n				\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						\n						Public Comment Period\nThe public comment period for this phase of the project closed on November 2\, 2025. All comments received during the meeting and through the mail\, email\, and online form are being reviewed by the project team. \nAlthough the comment period has ended\, community members are encouraged to stay informed as the project progresses. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Stay Informed\nTo receive project updates\, please sign up for the project mailing list below.  \nFor questions\, please contact: \nChristian.Lopez@wsp.com \n					\n				\n			\n				\n				\n				\n				\n				\n\n                \n                        \n                            NM 554 El Rito Bridge Replacement Project\n                            Milepost 12.3 to 12.6\, CN 5101287 \n                        \n                        CommentsThis field is for validation purposes and should be left unchanged.First Name(Required)Last Name(Required)Email Address(Required)Mailing AddressCAPTCHA
URL:https://www.dot.nm.gov/event/el-rito-bridge/
LOCATION:El Rito Public Library\, 182 Placitas Rd\, State Rd 215\, El Rito\, TX\, 87530\, United States
CATEGORIES:NMDOT Projects,Public Meetings
END:VEVENT
END:VCALENDAR