BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20210314T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20211107T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20220217
DTEND;VALUE=DATE:20220320
DTSTAMP:20260307T210918
CREATED:20220210T203613Z
LAST-MODIFIED:20220510T215535Z
UID:15439-1645056000-1647734399@www.dot.nm.gov
SUMMARY:Request for Input on Environmental Assessment for the US 64 Alignment Study\, CN 5101170
DESCRIPTION:REQUEST FOR INPUTNMDOT\, in cooperation with FHWA\, is providing the attached Environmental Assessment (EA) for 30-day public inspection and comment.   The EA provides details of the proposed US-64 reconstruction project between the Arizona-New Mexico state line and Shiprock\, NM\, as well as the anticipated social\, economic\, cultural and environmental impacts of the project.  As detailed in the EA\, the project occurs in a diverse and complex cultural and environmental setting.  The proposed project will make improvements to highway safety and performance\, including enhancements to paved shoulders\, pavement structure\, curves\, drainage\, guardrail and barriers\, intersection turn lanes\, crosswalk illumination\, and reconstruction of bridges.  The project design\, and development of the EA\, were undertaken with previous stakeholder and public involvement between NMDOT and affected landowners\, public and tribal agencies\, and local communities. \n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Environmental Assessment\n						for US 64 Alignment Study\, US 160 at Teec Nos Pos to US 491 in Shiprock\, CN 5101170 \n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					\n					\n						\n						\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						How to Submit Comments\n						Questions and comments about the EA must be submitted in writing and are welcome until March 19th\, 2022\, at which time the 30-day public comment period will be closed.   Please address all written comments to Jennifer Hyre. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						WSP USA c/o Jennifer HyreAttention:  US 642440 Louisiana Blvd NE\, Suite 400Albuquerque\, NM 87110 \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Email: Jennifer.Hyre@wsp.com \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						To request a translation or assistance accessing the EA\, contact Jennifer Hyre at (505) 878-6577.
URL:https://www.dot.nm.gov/event/ea-for-us-64-alignment-study/
CATEGORIES:NMDOT Projects,Public Meetings
END:VEVENT
END:VCALENDAR