BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//NMDOT - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:NMDOT
X-ORIGINAL-URL:https://www.dot.nm.gov
X-WR-CALDESC:Events for NMDOT
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Denver
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20210314T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20211107T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Denver:20220809T000000
DTEND;TZID=America/Denver:20220830T235900
DTSTAMP:20260520T215727
CREATED:20220808T164427Z
LAST-MODIFIED:20240521T221420Z
UID:16984-1660003200-1661903940@www.dot.nm.gov
SUMMARY:DC Fast EV Charging Grant Program
DESCRIPTION:August 9 – 30\, 2022\nThe New Mexico Department of Transportation (NMDOT) will distribute American Rescue Plan Act of 2021\, Section 9901 State and Local Fiscal Recovery Funds that were appropriated to the NMDOT through HB 2 in the 2021 2nd Special Session for planning\, engineering services\, design\, and installation of Electric Vehicle (EV) DC Fast charging stations across New Mexico under the NMDOT Level 3 Direct Current Electric Vehicle Charging Station Grant Program (DC Fast EV Charging Program) with a minimum of 50kw per port while simultaneously charging. The proposed charging station projects will address equitability and cost effectiveness as to where the EV charging stations (EVCS) are to be located.  The EVCS site must be accessible to the public and any State Fleet Vehicle for use 24-hours per day and seven days per week\, have dusk to dawn lighting\, and be within a short walking distance\, not to exceed a quarter mile to retail or service establishments. \nIn their proposals\, applicants must take into consideration equity\, recreational access\, cost effectiveness\, operation and maintenance of EVCS\, address geographic diversity of EVCS in rural areas\, and Justice 40 issues (https://www.whitehouse.gov/environmentaljustice/justice40/). This grant program will prioritize rural locations\, low and moderate-income areas of our state\, and help in alleviating economic and racial disparities. \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						Download the full legal notice by clicking here:  Legal Notice \n \n					\n				\n			\n			\n				\n				\n				\n				\n				\n				\n				\n				\n				\n				\n					l\n					\n						Grant application and Policy\n						To download the grant application and policy click the options below. \n\nProgram Policy\nGrant Application\nFAQs\n\n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						\n						NMDOT will only accept applications electronically and proposals must be submitted via email to: paul.montoya@state.nm.us \n					\n				\n			\n				\n				\n				\n				\n				\n					\n					\n						Program Contact Information\n						Inquiries related to the project requirements\, application\, application requirements\, and other aspects of this Grant Program should be sent to NMDOT at paul.montoya@state.nm.us with subject title: “Questions (DC Fast EV Charging Program)”.
URL:https://www.dot.nm.gov/event/dc-fast-ev-charging-grant-program/
CATEGORIES:Campaign Events,Deadlines and Events,Electric Vehicles,NMDOT Projects
END:VEVENT
END:VCALENDAR